Client Name:
Year:

  • Yas Island Development Project

    Geotechnical investigation of the state of the art Formula One Yas Marina Circuit and all hotels on the island, establishing site laboratories for quality control of concrete, asphalt, earthworks, metals and steel, post tensioning works, pile testing and non destructive testing of concrete.

    Location: Abu Dhabi
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/yas-island-development-project.jpg
    ALDAR Properties
    2010
  • Emirates Palace Hotel

    On-shore and off-shore geotechnical investigation including drilling of boreholes, CPT’s and intensive field and laboratory testing.

    Location: Abu Dhabi.
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Palace-Hotel%2C-Abu-Dhabi.jpg
    KEO/TURNER/ HALCROW consultants
    2001
  • Sheikh Zayed Grand Mosque

    Geotechnical investigation consisted of deep boreholes, pressure meter testing and intensive field and laboratory testing.

    Location: Abu Dhabi.
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/sheikh_zaied.jpg
    Impregilo
    1996
  • Museum of the Future

    Borehole drilling, cone penetration testing (CPT), trial pit excavation, geophysical logging, field testing including packer and pressure-meter testing.

    Location: Dubai
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/zzzzzx.jpg
    Meraas Development
    2015
  • Blue Water Dubai

    Site investigation including drilling of 90 boreholes, field testing and laboratory testing. 

    Location: Dubai
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/xcxx.jpg
    Meeras Holding
    2014
  • Palm Jumeirah and Palm Jabel Ali

    Geotechnical investigation, in situ testing including CPTU, SPT and plate bearing tests, geophysical testing including crosshole seismic study, construction material tests including pile testing and zone loading with real time settlement monitoring.

    Location: Dubai
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/plam-jumeirah.jpg
    Nakheel PJSC
    2004
  • Burj Khalifa

    Geotechnical investigation including borehole drilling, in situ testing including Elastometer testing, piezometer installation, geophysical testing including verticality survey and Cross-hole P and S tomography, in addition to routine and specialized testing for the soil, rock and groundwater sampling.

    Location: Dubai
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/borj-khalifa.jpg
    Emaar Properties
    2003
  • Abraj Quartier Tower AQ-07 and Town Houses - The Pearl Qatar

    Quality Control & Materials Testing.

    Location: Doha
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/4_0.jpg
    Qatari Arabian Construction Co. (QACC)
    2015
  • Al Wakrah Stadium

    Quality control and material testing.

    Location: Doha
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/2.jpg
    Hamad Bin Khalid Contracting Company W.L.L (HBK)
    2014
  • Qatar Integrated Railway Project - Metro Phase 1 - Major Stations

    Quality control and material testing.

    Location: Doha
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/6.jpg
    SAMSUNG-OHL-QBC Joint Venture
    2013
  • Museum of Islamic Art

    Geotechnical investigation, field testing, and material testing.

    Location: Doha
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/museum-if-islamic-art.jpg
    I.M. Pei
    2008
  • Riyadh Metro

    Geotechnical investigation, cavity probing rock level detection and rock fracture grouting. Geotechnical investigation works consisted of borehole drilling, field testing including SPT and Packer, as well as laboratory testing. 

    Location: Riyadh
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/4_2.jpg
    Fast Consortium
    2014
  • Jeddah Metro

    Drilling a total of 150 boreholes to depths ranging from 10 to 45 meters below existing ground surface, installation of piezometers, and performing field and laboratory tests.

    Location: Jeddah
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/2_0.jpg
    Jeddah Metro Company (JMC)
    2015
  • Saudi Land Bridge Railway

    Borehole drilling, trial pit excavation, cone penetration tests (CPTs), seismic refraction survey, down hole seismic testing and laboratory testing on soil and rock samples.

    Location: Jeddah
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/3_1.jpg
    SAR
    2014
  • Kingdom Tower Project

    Geotechnical Investigation

    Location: Jeddah
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/maxresdefault.jpg
    Emaar
    2009
  • Jordan Nuclear Power Plant Project

    Site Investigation including borehole drilling, field testing, borehole geophysics and laboratory testing.
     

    Location: Amman
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/1_3.jpg
    Dar Al-Handasah & KEPCO E&C
    2015
  • Ayla Oasis

    Site investigation and geotechnical evaluation including drilling of more than 500 boreholes for several prestigious projects including Arabian Venice, the Island Apartments, the Fortress Hotel & lagoon projects among others. Additionally, ACES conducted geophysical surveys, field and laboratory testing, piezometer installation, materials testing and set up of quality control site labs.

    Location: Aqaba
    http://www.aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Ayla1.jpg
    Ayla Consultancy & Project management Co.
    2010