ACES News

ACES Dubai Completes the Jumeirah Open Beach Project

Date: 
26 Nov 2014

ACES Dubai successfully  completed the prestigious project of  the Jumeirah Open Beach for Meeras Holding in Dubai, UAE. The scope of work included drilling more than 60 boreholes with depths ranging from 25 to 30 meters from below seabed using two “ Jacked-up” pontoons. 

The project was handled by ACES Dubai staff and drillers in the most professional manner to ensure high drilling efficiency, optimum productivity, safe working conditions for the drillers and maximum client satisfaction.

http://www.aces-int.com/sites/default/files/1_3.jpghttp://www.aces-int.com/sites/default/files/2_1.jpg

Share this