ACES Dubai

ACES Dubai

Burj Khalifa

Image: 
Year: 
2003
Client name: 
Emaar Properties

(2003-2004)

Geotechnical investigation including borehole drilling, in situ testing including Elastometer testing, piezometer installation, geophysical testing including verticality survey and Cross-hole P and S tomography, in addition to routine and specialized testing for the soil, rock and groundwater sampling.

Palm Jumeirah and Palm Jabel Ali

Image: 
Year: 
2004
Client name: 
Nakheel PJSC

(2004-2008)

Geotechnical investigation, in situ testing including CPTU, SPT and plate bearing tests, geophysical testing including crosshole seismic study, construction material tests including pile testing and zone loading with real time settlement monitoring.

Jumeirah Garden City

Image: 
Year: 
2008
Client name: 
Meraas Development and WSP Middle East

Geotechnical investigation including drilling of deep boreholes, performing specialized in situ tests, laboratory testing and interpretative geotechnical reporting.

Proposed Arabian Canal Project

Image: 
Year: 
2007
Client name: 
Limitless

(2007-2008)

Geotechnical investigation including drilling of geotechnical borings, down hole geophysics, and hydro geological investigations with double packers and infiltration tests in trial pits.

Dubai Metro (Red and Green Line)

Image: 
Year: 
2005
Client name: 
JT Metro / M/S. RTA

(2005-2007)

Geotechnical drilling of several boreholes, performing specialized in situ tests, laboratory testing, and electrical resistivity testing.

Emiratis Housing Development Project, Al Ain, UAE

Image: 
Year: 
2011
Client name: 
Pal Technology / Dorch Group

Electrical Resistivity Tomography Survey of a 250 hector area and drilling of diagraphy boreholes with varying depths.

Dubai International Airport Expansion

Image: 
Year: 
2011
Client name: 
Dubai Civil Aviation

Installation of 4 data loggers for long term monitoring of strains and temperature of massive raft foundation at Dubai International Airport. Installation of strain gauges was carried out during several stages of raft construction.